Winter Refurbishment Works Confirmed

A programme of repair and maintenance work has been agreed with DDSI and AFPM. This will take place over the winter months with completion expected before Easter.

The work includes: is manly in the Pool Area and includes; retile various parts of pool with new tiles and glue system; repair and paint low walls close to pool; new bulbs in lights; attempt to find plants for top of pillars and maintain properly; remove dated and damaged small fountain and landscape around low wall with well-constructed feature garden; tidy paint work on semi-circular wall behind fountain; sun bed material replacement and cleaning; boundary wall cleaning and painting; new pool signs. Elsewhere the DD Entrance signs to be repaired and painted.

These are much needed improvements after a long period without any proper maintenance organised by the DDOA.