Dunas Douradas Central Pools Refurbishment Project Completed

Following owners approval of the central pools refurbishment project at the April 2019 EGM, we are delighted to report the project is now completed.

The contractor is local company DBC Views and we have employed a local project manager and pool expert who is regularly on site representing the owners.

The work commenced in December 2019 with stripping of the old tiles and coping stones followed by pressure testing of the existing pipework. It is pleasing to report the pool structure was in good order with some work needed to repair/replace underwater lights and skimmers. The water proof liner was applied followed by tiling and grouting. A leak was found in the pipework and this has been rectified. The saltwater dosing system is installed, the pool has been filled and testing and commissioning of systems was completed in March 2020.. .

The photographs show progress and the scale of the work.

The Project was completed in March 2020 and the pool is now open and maintained by AFPM.